Airport Authority


The New Hong Kong International Airport, Lantau Island
Mechanical installation consists of 6 Chillers @ 12,000 kW, 500 air Handling Units, 600 Fans, 650 Fan Coil Units, 11,000 Dampers, 3,500 Tonnes Ductwork, 58 Km Pipework (Largest 1.2m) and 14,000 Points BMS System.

Electrical installation consists of 60 Transformers, 20 Main LV Switchboards, 1,100 Distribution Boards, 80,000 Luminaires, 150 Km Cables and 2,500 Km Small Wiring.

Fire Services installation consists of 23,000 nos Heat/Smoke Detectors, 50,000 nos Sprinklers, 300 kms Pipework 35 kms ASD Systems and 60 FM200 Systems.

Plumbing and Drainage Installation consists of 4,000 Items of Sanitary Wares, 180 Pumps, 95 Km Pipework and 5,000 Cu M/day (water consumption).